

96%positive reviews
40,631 positive1,709 negative
What players say
Pros
Adorable beavers and calm zen gameplay
Stable and good performance
Cons
Removed features fundamentally change the game
Barely playable after an update
Mixed
Some call it a nice zen game, others say the design shift alienated players
System requirements
Minimum:
Requires a 64-bit processor and operating system
OS: Windows 10 or newer
Processor: 4-core 1.7 GHz or better
Memory: 8 GB RAM
Graphics: GeForce GTX 950, Radeon R9 380 or similar
DirectX: Version 11
Storage: 3 GB available space
Humans are long gone. In a world struck by droughts and toxic waste, will your lumberpunk beavers do any better? Timberborn is a sandbox city-building game featuring ingenious animals, vertical architecture, water physics, and terraforming. Contains high amounts of wood.
Mankind turned Earth into a…
Ratings
- 80IGDB players17 ratings
- 86Critics1 reviews
- 83Overall18 scores
Time to beat
- 23 hStory onlyto the credits
- 31 hStory and extraswith side content
- 51 hCompletionist100%
Languages
| Language | Interface | Full audio | Subtitles |
|---|---|---|---|
| English | |||
| Chinese (Simplified) | |||
| Chinese (Traditional) | |||
| French | |||
| German | |||
| Italian | |||
| Japanese | |||
| Korean | |||
| Polish | |||
| Portuguese (Brazil) | |||
| Russian | |||
| Spanish (Spain) | |||
| Thai | |||
| Turkish | |||
| Ukrainian |
Links
Games like Timberborn
IGDB pickCities: Skylines
93% positive · $29.99
Single-player
IGDB pickAven Colony
72% positive · $29.99
Single-player
IGDB pickFoundation
87% positive · $34.99
Single-player
IGDB pickGoing Medieval
89% positive · $29.99
Single-player
IGDB pickStranded: Alien Dawn
84% positive · $34.99
Single-player
IGDB pickCaptain of Industry
90% positive · $24.49
Single-player
IGDB pickRusty's Retirement
97% positive · $6.99
Single-player
IGDB pickFarthest Frontier
86% positive · $34.99
Single-player
IGDB pickWaterpark Simulator
96% positive · $12.99
Multi-player
IGDB pickAge of Darkness: Final Stand
74% positive · $27.99
Multi-player
IGDB pickTower Wizard
97% positive · $2.99
Single-player

Endzone - A World Apart
77% positive · $24.99
Single-player

Dwarf Fortress
95% positive · $29.99
Single-player

Ostriv
95% positive · $24.99
Single-player

The Wandering Village
92% positive · $29.99
Single-player









